Instant PEB Cost & Tonnage Estimator

Project Parameters

Metric Dimensions (Meters)
50 m
15m (49 ft) 80m 150m (492 ft)
24 m
10m (33 ft) 35m 60m (197 ft)
8 m
5m (16 ft) 10m 16m (52 ft)
Engineered Estimation Summary

Project Scope Breakdown

Built-Up Area:
12,916 Sq.Ft
(1,200 m²)
Steel Tonnage:
33.6 Metric Tons
Turnkey Handover:
45 to 60 Days
Estimated Budget Range (INR)
₹ 31.0 - ₹ 36.5 Lakhs
* Includes Primary Steel, Purlins, Roofing, Anchor Bolts & Standard Erection. Exact rates subject to foundation site condition & soil bearing capacity.
Engineering Note: K&I ENTERPRISES engineers all PEBs individually using STAAD.Pro and TEKLA 3D structural modeling to optimize steel consumption by up to 25% while complying strictly with IS 800:2007.